(1)首先應(yīng)確定是否為設(shè)計(jì)與結(jié)構(gòu)不合理造成滲漏。若是,應(yīng)首先消滅幕墻結(jié)構(gòu)上不合理應(yīng)力。
(1) first of all, it should be determined whether the design and structure is not reasonable cause leakage. If, it should first clear the structure of the wall is not reasonable stress.
(2)對(duì)原幕墻外觀材質(zhì)進(jìn)行分析。
(2) analysis of the surface material of the original curtain wall.
(3)選擇配套的密封材料及基底處理劑,并進(jìn)行幕墻密封粘接的指標(biāo)測(cè)試,各項(xiàng)指標(biāo)應(yīng)達(dá)到國(guó)家標(biāo)準(zhǔn)。
(3) the selection of the matching of the sealing material and the substrate treatment agent, and the curtain wall sealing adhesive test indicators, the indicators should reach the national standard.
(4)剔除幕墻原有密封材料。
(4) removing the original sealing material of curtain wall.
(5)用砂紙及清洗劑將被密封部位清洗干凈。
(5) with sandpaper and sealing parts cleaning agent will be clean.
(6)將防污護(hù)面膠帶貼于被密封部位兩側(cè)。
(6) the antifouling protective tape affixed to the sealing parts on both sides.
(7)在被密封部位外觀涂刷基底處理劑。
(7) brushing the surface of the base of the sealing surface treatment agent.
(8)填塞襯墊材料,視板縫寬度大。ㄟ|寧人事考試網(wǎng)站武漢網(wǎng)站建設(shè)),填入直徑比寬度大3~5mm的聚乙烯泡沫棒材,并調(diào)整到縫隙深度等于寬度的0.5~0.7倍為宜;
(8) packing pad material, as the seam width size in diameter than the width of 3 ~ 5mm polyethylene foam bar, and adjust to the gap depth equal to the width of 0.5 ~ 0.7 times;
(9)調(diào)整膠槍口徑,將密封材料嵌入密封部位,并用刮刀修整外觀。
(9) to adjust the diameter of the glue gun, the sealing material is embedded in the sealing part, and the surface is trimmed with a scraper.
(10)揭除防污護(hù)面膠帶。
(10) removal of antifouling protective tape.