1、將液體添加劑倒入干凈的攪拌容器中,然后按比例一邊攪拌一邊緩慢加入粉料,充分攪拌3-5分鐘直至生成無粉團的、均勻的膠漿,并在操作時間內(nèi)用完。建議使用機械攪拌(400-500轉/分鐘),以取得最佳的攪拌結果;
1, the mixing container liquid additives into clean, and then according to the proportion while stirring slowly add powder, paste stir until generating 3-5 minutes of dough, uniform, and used in operation time. Mechanical agitation (400-500 / min) is recommended to obtain the best mixing effect;
2、用輥子、刷子將漿料均勻涂刷于處理好的底材上,根據(jù)使用環(huán)境及性能要求涂刷2層或2層以上; 一般屋面工程屋頂防水層厚度為1mm,地下工程施工規(guī)范厚度要求為1.5-2mm;
2, with a roller brush, paste evenly on the substrate treatment is good, according to the requirements of the use of the environment and performance of brushing 2 or more than 2 layers; the general engineering waterproof layer thickness of 1mm, regulate the construction of underground engineering requirements for thickness 1.5-2mm;
3、做完一層后,必須待其略為干固(剛好不粘手)后,再做第二層,一般通常需1-3小時施工,詳細情況視基面的密實度以及當時的氣溫而定。假如超過24小時,或涂層已經(jīng)固化,在其上涂刷第二層時,必須先用清水重新潤濕外觀;
3, finish a layer, which must be slightly dry (just not sticky), then do second layers, usually takes 1-3 hours, depending on the surface density and the temperature was determined. If more than 24 hours, or the coating has been cured, in the second layer of coating, must first re wetting the surface with water;
4、養(yǎng)護固化:漿料涂刷后第二天起,建議用細霧噴水或濕布覆蓋涂層2-3天,再進行閉水試驗;對于長期盛水的水池應待其空置兩周后才盛水;
4, maintenance and curing: second days after brushing slurry, with fine mist spray water or wet cloth to cover for 2-3 days, then the closed water test; for the long-term water pool should wait two weeks after a vacancy;
5、攪拌好的漿料一般正常宜在1小時內(nèi)用完,出現(xiàn)凝固的材料不可再用;切勿摻水攪拌,也不要隨意改變?nèi)橐旱谋壤?br/>5, the well mixed slurry should be finished within 1 hours, the solidification material can not be reused; do not water mixing, also do not change the proportion of emulsion.