1、施工前應(yīng)保證下層溫度高于露點(diǎn)溫度3℃,施工過程中應(yīng)保持延續(xù)攪拌;
1, the construction should ensure that the basic temperature is higher than the dew point temperature of 3 degrees C, the construction process should be kept continuous mixing;
2、若檢驗(yàn)時(shí)發(fā)現(xiàn)涂層有鼓泡、漏噴等缺陷,則必要立即進(jìn)行修補(bǔ);
2, if the test found that the coating has a bubble, leakage and other defects, the need for immediate repair;
3、如缺陷部位發(fā)現(xiàn)離噴涂時(shí)間較短(≤6h),可對缺陷涂層外觀進(jìn)行打磨,清理后直接進(jìn)行二次噴涂;
3, such as the defects found from the spraying time is short (less than 6h), the defects of the coating surface grinding, cleaning up directly after the two spraying;
4、假如缺陷部位發(fā)現(xiàn)離噴涂時(shí)間較長(>6h),則應(yīng)對缺陷涂層外觀(向外擴(kuò)展5~10cm范圍)打磨清理后,施作專門的處理劑,然后采用專用修補(bǔ)設(shè)備噴涂LM復(fù)合防腐屋頂防水涂料并修補(bǔ)刮平(河北人事考試網(wǎng)站),使整個(gè)涂層延續(xù)、致密、均勻。
4, if the defective parts found from the spraying time is longer (more than 6h), then deal with the defects of the coating surface (extended range of 5 ~ 10cm) grinding after cleaning, apply special treatment, and then use special equipment repair sprayed LM composite waterproof anti-corrosion coating and repair, scraping, make the whole continuous, dense and uniform coating.
5、雨天不得施工;四級以優(yōu)勢力不宜施工;
5, rainy days shall not be constructed; more than four wind construction;
6、施工現(xiàn)場應(yīng)安全用電,杜絕火源并配備好響應(yīng)的消防器材。
6, the construction site should be safe use of electricity, put an end to fire and equipped with appropriate fire equipment.