基面的清理可用沖洗法也可用清掃法進(jìn)行,使用沖洗法應(yīng)保證在基面無(wú)明水的條件下,進(jìn)行下一步施工;
Basal clean-up available rinse method can also be used in cleaning method, douche should ensure that under basal NO Mingshui, the next step of construction.
對(duì)周全施工基面進(jìn)行底涂。對(duì)排水孔、穿墻管、裂縫、分割縫、陰陽(yáng)角等節(jié)點(diǎn)、細(xì)部進(jìn)行預(yù)增強(qiáng)處理;
The overall construction of the base surface coating. The drainage hole, wall pipe, crack, split seam, yin and yang angle node, details of pre emphasis processing;
下層處理打底層:水泥:細(xì)沙:乳液=1:1:0.2:0.2。若施工基面粉化,沙化,平整度達(dá)不到要求,可按打底層配比配制聚合物抹面砂漿將基面修復(fù)。修復(fù)時(shí)先將基面用水充分濕潤(rùn),待無(wú)明水后,用拌好的聚合物抹面砂漿,將基面薄刮一遍。如許可以進(jìn)步工程質(zhì)量,降低施工成本;
The base layer: cement: Sand: emulsion =1:1:0.2:0.2. If construction of the base surface of powder, desertification, flatness is not up to the requirements, according to the hit ratio of the underlying preparation of polymer finishing mortar base surface repair. Repair the surface water to fully wet, to be no Mingshui, with a good mix of polymer finishing mortar, surface thin scratch again. This can improve the engineering quality and reduce the construction cost;
混料方法:按施工要求比例將粉料倒入乳液桶內(nèi),用攪拌器攪拌均勻即可使用;
Mixing method: according to the proportion of the construction requirements will be powder into the emulsion barrel, with the mixer can be used to mix;
鋪貼加筋布粘接層品牌策劃,一次可按布寬涂刷5—10米長(zhǎng)濰坊設(shè)計(jì),趁濕立即鋪開(kāi),用刮板梳平所有皺褶.趕出氣泡,并使布下的涂料透過(guò)布上。如出現(xiàn)皺褶、空鼓(因布沒(méi)粘牢)均應(yīng)剪開(kāi).用涂料重新粘好;
Paving and reinforced bonding layer, a can according to broad brush cloth 5 - 10 meters long, while wet immediately spread, scraper flat comb all the creases. Out of the bubble and make cloth coating through the cloth. Such as the emergence of wrinkles, hollowing (due to cloth by mistake) should be cut by coating reattached;
參考用量(粉料+乳液)及涂層成膜厚度。
Reference dosage (powder + emulsion) and coating film thickness.